Delays in Your New Construction Project? Understanding Potential Causes.

By | June 10, 2025
Featured image for Delays in Your New Construction Project? Understanding Potential Causes.

Content image for Delays in Your New Construction Project? Understanding Potential Causes.

Are you dealing‍ with frustrating construction‍ delays in your‍ new building‌ project? Delays are a common pain‌ point‌ in‍ the construction industry, often‌ leading‌ to‍ increased costs, stress, and‌ unmet expectations. Construction delays‌ refer‍ to any situation‌ where the‍ completion‌ of a‍ building‍ project‌ extends‍ beyond the‍ agreed-upon timeline. If you’re a homeowner, you‌ are probably eager to move into your‍ dream home. As a‍ contractor, time‌ is money. This‌ article will explore‌ the potential causes‍ of construction delays and‍ provide actionable‍ strategies to‍ minimize‍ their‍ impact. We will delve into‌ factors such as planning‍ and‌ design issues, material procurement challenges, labor shortages, and‌ external factors like weather and‍ regulatory hurdles. This‍ guide‌ will empower you‌ to‌ navigate the complexities of construction projects and increase‌ the likelihood of on-time completion. We’ll start‌ by‍ identifying common causes, then‌ explore‌ solutions and‌ preventive‍ measures.

Understanding the Root Causes‍ of Construction Delays‍

Construction delays can stem‌ from a multitude of interconnected‌ factors. Identifying‌ the root cause is the first‌ step toward effective mitigation. These‌ delays can‌ impact not only‌ the project timeline‌ but‌ also the‌ budget‍ and overall satisfaction of all parties involved. From‍ initial planning blunders‍ to unforeseen‍ site‌ conditions, understanding these‍ causes‍ is‌ crucial for proactive‍ management.

Inadequate Planning and‌ Design‍

One‍ of the most common‌ culprits‍ is‌ inadequate‍ planning and design. If the initial‍ blueprints are incomplete, ambiguous, or‌ lack‌ critical‌ details, it‍ can‌ lead‍ to‌ significant‍ delays down the line. For‍ example , if the structural‍ design does not‍ account for‌ local‌ building‌ codes‍ or environmental‌ factors, it‌ will‌ inevitably require‌ revisions‍ and‍ redesign, adding‍ weeks‌ or even months‌ to the‍ project‍ schedule. A‍ well-defined project‌ plan , including realistic timelines and resource allocation‍ , is‌ essential‌ for a smooth‍ construction‌ process. Detailed‍ architectural plans , structural‌ engineering‌ reports , and‌ comprehensive site assessments‍ can prevent‍ costly redesigns‍ and‍ rework.

Related Post : The Importance of Having Legal Representation When Buying New Development Property

Material‍ Procurement‌ Issues‍

Another significant‌ cause‍ of construction delays‌ revolves‌ around material‍ procurement. Supply‌ chain‍ disruptions, material shortages, and‌ price fluctuations‌ can all‍ wreak havoc‌ on project‌ timelines. Consider‌ the case of‍ a‍ homeowner in‌ 2021 who‌ experienced a‍ six-month‌ delay due to a shortage‍ of‌ lumber‍ and increased material costs, impacting‌ their budget‍ severely. To combat these issues, it’s crucial‌ to maintain robust‍ relationships‌ with suppliers, explore alternative‌ sourcing‌ options, and implement‍ proactive‌ inventory management. Utilizing technology to track‍ material‌ availability‍ and predict‌ potential‌ shortages can‍ also‌ provide a competitive edge.

Labor Shortages and Skill‍ Gaps

Labor‍ shortages and skill‍ gaps represent a‍ growing‍ concern‌ in the‍ construction industry. A‌ lack‍ of skilled workers‌ , such as carpenters , electricians , and plumbers , can‌ lead to significant‍ project delays. For‌ example , a‍ construction‌ project in‍ a‌ rural area‌ might‍ face‍ delays‌ due‍ to the‍ limited‌ availability of qualified‌ tradespeople. To address‍ this‍ issue, companies can invest in training programs, offer‌ competitive‍ wages and‍ benefits, and leverage‍ technology to‍ improve productivity. Government initiatives‌ to promote‍ vocational‍ training and‍ apprenticeships‍ can‌ also play‍ a‌ vital‌ role‍ in‍ bridging‍ the‌ skills gap.

External‌ Factors: Weather and Regulations‍

External‌ factors , such as‍ adverse‌ weather conditions and regulatory hurdles‍ , can‍ also‍ contribute‌ to‌ construction delays. Heavy‍ rain, snow, or extreme‌ temperatures can‍ halt‍ construction‍ activities, especially for outdoor‌ tasks. Regulatory delays‌ , such as permit approvals and inspections , can also‍ add‍ weeks‍ or‌ months‌ to the‍ timeline. To‍ mitigate these risks, project‌ managers should factor in potential‍ weather delays during‍ the planning‍ phase and maintain open communication with‍ local authorities to expedite‍ permit approvals. Implementing‌ flexible‌ scheduling and staging work to accommodate‍ weather variations can also minimize disruptions.

The‌ Impact‌ of‌ Communication‌ and Coordination‌ on‌ Project Timelines‌

Effective‍ communication‍ and coordination are‌ vital‍ to keep‍ any‍ construction project on‌ track. When communication‍ breaks‌ down, misunderstandings arise, leading to‌ mistakes, rework, and‌ significant‍ delays. Ensuring that‌ all stakeholders‍ are on‌ the‍ same page‍ and that information flows seamlessly‌ is crucial for‌ project‌ success.

Communication Breakdowns Between Parties

One of the most common‌ sources‌ of‍ construction delays is‌ poor‌ communication between the various‍ parties involved‌ – the‌ homeowner, the architect, the contractor, and subcontractors. For instance , if the‍ homeowner‍ makes changes to the design without‌ properly‍ communicating them to the contractor‌ , it can‍ lead‍ to‌ misinterpretations and‍ costly rework. Establishing‍ clear‍ lines‌ of communication , using project management‍ software‌ , and‍ holding regular‍ meetings can ensure that everyone is informed‌ and aligned.

Coordination‌ Challenges Among‌ Subcontractors‍

Coordination‌ challenges among‍ subcontractors can also‍ contribute to project‌ delays. If‌ different‌ subcontractors‍ are not properly coordinated, it‍ can‍ lead to‍ scheduling conflicts and‍ inefficiencies. For example‌ , if the electrician is not informed about changes‍ in‍ the plumbing‍ layout, it‌ can‌ result‌ in rework and delays. To mitigate these challenges, project managers‌ should develop detailed schedules, facilitate‍ regular‍ coordination meetings, and use‍ technology to‌ track progress and identify potential bottlenecks.

The‍ Role‍ of Project Management in Streamlining‌ Communication

Effective project‌ management plays‍ a‌ critical‍ role in streamlining‌ communication and‌ ensuring‌ that all stakeholders‍ are‌ well-informed. A skilled‍ project manager‍ can‌ act as a central point‌ of‍ contact , facilitate communication‌ , and‌ resolve conflicts‍ efficiently. For‍ example , a project manager‍ might use a‍ project‌ management software‍ platform to share updates‍ , track progress‍ , and‍ manage communication between‌ the‌ various parties‍ involved. Regular‍ progress reports, site meetings, and‍ open communication‌ channels‍ can keep everyone on the same page and‍ minimize the risk‍ of misunderstandings.

Proactive‌ Strategies‍ to‍ Minimize Construction‌ Delays

Minimizing‌ construction delays‌ requires‍ a proactive‌ approach that‌ encompasses‌ meticulous planning, risk management, and continuous monitoring. Implementing‌ strategies‍ to address potential‌ challenges‍ before‍ they arise can‍ significantly improve the likelihood‍ of on-time project‌ completion.

Comprehensive‍ Risk‌ Assessment and‌ Mitigation‌

Conducting a comprehensive risk‌ assessment‍ is the‍ first step‌ in‌ minimizing‍ construction delays. This‍ involves identifying‍ potential‌ risks‍ , assessing‌ their likelihood‌ and impact , and‍ developing‌ mitigation strategies. For‌ example‌ , a‍ risk‍ assessment‌ might identify‌ material shortages as‍ a potential risk and recommend securing‌ supply contracts‍ or exploring‌ alternative materials. Regular‍ risk‌ reviews and‍ contingency‍ planning can‌ help‌ address unforeseen challenges and keep the‍ project‍ on track.

Detailed Contract Negotiation‌ and Management

A well-negotiated contract can‌ provide protection‌ against potential construction delays. The‍ contract‌ should‌ clearly define the scope of‌ work , timelines , payment terms‍ , and dispute‌ resolution mechanisms. For‍ example , it‍ should include‌ clauses that‌ address potential delays due‌ to‍ weather, material shortages, or regulatory issues. Regular contract‍ reviews and proactive management‌ can ensure that‌ all‍ parties are aware‌ of‌ their obligations‍ and‍ responsibilities.

Leveraging Technology for‍ Efficient‍ Project‍ Tracking‍

Leveraging‍ technology‍ can‍ significantly‌ improve project tracking‌ and communication. Project management‌ software‍ , mobile‌ apps , and cloud-based platforms can‌ facilitate real-time updates , track progress‌ , and‌ manage‍ communication between‍ stakeholders. For example , using‍ a‍ mobile app to track‌ material‍ deliveries‌ and site‍ progress can help‌ identify‍ potential‌ delays early on‌ and take‌ corrective action. Technology can‍ also improve collaboration , reduce paperwork , and‍ enhance decision-making.

Financial‍ Implications‍ of‌ Construction‍ Delays‍

Construction‌ delays‌ can‌ have severe‍ financial‌ implications‌ for‌ both‌ homeowners and‍ contractors. Understanding‌ these financial risks‍ and implementing‌ measures‌ to mitigate them is‌ essential‍ for protecting your investment.

Increased Project‍ Costs‍

One of‍ the most direct financial‍ consequences‌ of‍ construction‌ delays is increased‍ project‍ costs. Delays‌ can‍ lead‌ to‍ higher labor costs‍ , material price increases , and‌ additional‍ overhead expenses. For example , if‍ a‍ project is delayed due‍ to material shortages, the contractor‍ may‌ need to pay higher‌ prices for materials‌ or incur‍ additional transportation costs. Homeowners‍ may‌ face‍ increased‌ living‍ expenses if‍ they‍ cannot move‌ into their new home‌ on time.

Potential Legal Disputes‍ and Penalties

Construction‌ delays‍ can also‌ lead to legal disputes‌ and‍ penalties. If the contract‍ includes‍ a‍ clause‍ that imposes‌ penalties‌ for delays, the‌ contractor‍ may be‍ liable for‍ damages. Homeowners may‌ also pursue legal‍ action‌ if‌ the contractor‍ fails‍ to‌ complete the project‍ on time. To avoid these issues, it’s crucial‌ to‍ have‌ a‌ well-drafted contract‍ that‍ clearly‌ defines the‍ consequences‌ of‍ delays and‍ provides a mechanism‌ for‍ dispute‍ resolution.

Impact on‍ Property Value‍ and‍ Resale Potential

Construction‌ delays can impact‍ the‌ property value and‍ resale‌ potential of a home. A delayed‍ project may be perceived‍ as‌ being of lower quality‍ or having‍ unresolved issues. This‍ can deter potential buyers‌ and reduce the property’s market‍ value. Addressing‍ delays promptly and ensuring that the project‍ is completed‍ to a high‍ standard can help mitigate these negative‍ impacts.

Case‌ Studies: Learning‌ from Real-World Construction‌ Delays‍

Examining real-world case‍ studies can provide valuable insights‌ into the causes and consequences of construction‍ delays. By‌ learning from past‍ mistakes, project‍ managers‍ and homeowners‌ can implement‍ better‍ strategies‌ to prevent delays‍ and manage‍ their‌ impact.

Case‍ Study 1: Residential Home Construction Delay

A homeowner‍ in‌ a‌ suburban area‌ experienced‍ a six-month delay in‍ the construction‌ of their new home‌ due‍ to‍ a‍ combination‍ of factors. The‌ initial plans were incomplete, leading to‌ redesigns, and‌ material shortages further‍ exacerbated the‍ delays. Communication‍ breakdowns between‍ the‌ homeowner and‍ the contractor‌ also‌ contributed to‌ the‌ problem. The‍ homeowner incurred‌ additional‍ living‌ expenses and‌ faced‍ significant‍ stress as a‌ result‍ of‍ the‌ delays. This case‌ highlights‌ the‍ importance‌ of thorough planning, clear communication, and‌ proactive risk‌ management.

Case Study 2: Commercial‍ Building‌ Construction Delay

A‍ commercial building‍ project in a‍ downtown area faced significant delays‌ due to regulatory hurdles and labor‌ shortages. Permit approvals‍ took‍ longer than expected, and the limited availability of‌ skilled workers slowed down construction progress. The‍ project‌ manager failed to‍ anticipate these‍ challenges‌ and did not have‌ contingency‌ plans in‍ place. As‍ a‍ result, the‌ project‌ was delayed‍ by nine months, and‌ the developer‍ incurred‍ substantial‍ financial losses. This case underscores‍ the need for comprehensive risk‌ assessment‌ and‍ proactive mitigation‍ strategies.

Lessons‍ Learned and Best‍ Practices‍

These case‍ studies‍ highlight‍ several‍ key‍ lessons and best practices‍ for‍ minimizing‍ construction delays. These‍ include:

  • Thorough planning‌ and design‌
  • Proactive‌ risk‌ management
  • Clear‌ communication and coordination
  • Detailed‍ contract‍ negotiation‌ and‌ management‍
  • Leveraging technology for‌ efficient project‌ tracking‍

By‍ implementing these‍ strategies, homeowners and contractors‍ can‍ reduce‌ the‍ likelihood of construction‌ delays and‍ ensure smoother project‍ completion.

Understanding Contractual Agreements and Delay Clauses‌

Contractual agreements play‍ a vital role‌ in defining‍ the‌ responsibilities, timelines, and potential‌ consequences‍ of‌ construction delays. A well-drafted‍ contract can protect‍ both the‍ homeowner‌ and the‌ contractor by‌ clearly outlining the‌ expectations and remedies available in‌ case‌ of delays.

Key Contractual Provisions Related‍ to Delays‍

Several‌ key provisions‌ should‍ be‌ included‍ in a construction‍ contract to‌ address potential delays‍ effectively. These include:

  • Force‍ Majeure‌ Clause: This clause defines events beyond the‌ control of either‌ party, such as‍ natural‍ disasters or government regulations, that‍ may‍ excuse delays.
  • Change Order Clause: This‍ clause outlines‍ the‌ process‍ for‍ making‌ changes‍ to the‍ scope of work and how‍ those changes‍ may impact‌ the‍ timeline‍ and‌ cost.
  • Delay Notification‌ Clause: This clause‌ specifies the‌ requirements for notifying the other party of‍ any‌ potential delays and‌ the documentation required.
  • Dispute‌ Resolution Clause: This‍ clause outlines the‍ mechanism for‌ resolving‍ disputes related‌ to delays, such‍ as mediation or arbitration.

Negotiating Fair‍ and Balanced Delay Clauses

Negotiating fair and balanced delay‌ clauses is‌ essential‌ for‌ protecting‍ your‍ interests. Homeowners should‌ ensure‍ that‌ the contract‍ includes provisions‍ that‌ address‍ potential‍ delays caused‌ by the contractor, such as poor workmanship‌ or failure to adhere to‍ the schedule. Contractors‍ should ensure‌ that‌ the‍ contract‌ includes provisions that‍ address‍ potential‍ delays caused by‌ the homeowner, such as changes‍ to‍ the‌ design‍ or‌ failure to make‌ timely‍ payments.

Documenting and Tracking‌ Delays as per‌ Contractual‌ Terms‍

Documenting‍ and‍ tracking‌ delays as per‍ the contractual‍ terms‌ is crucial for‌ preserving‌ your‍ rights. This‌ includes:

  • Maintaining‍ a detailed record of all delays, including the date, cause, and‌ impact.
  • Providing timely written‌ notice‌ of any‍ delays to the other party, as‌ required by the contract.
  • Gathering evidence to‌ support your claims, such as photographs, emails, and‌ meeting minutes.

By‍ adhering‍ to the‌ contractual‌ terms and‌ maintaining thorough documentation, you‍ can strengthen‌ your position in‌ case of a dispute.

Managing‍ Client‌ Expectations During‍ Construction‌ Delays‍

Construction delays‌ can lead to frustration‍ and‌ disappointment for homeowners. Managing‌ client‌ expectations‌ effectively‌ is‍ crucial‌ for‌ maintaining‌ a positive‌ relationship‌ and‍ minimizing conflicts.

Proactive‌ Communication‍ and Transparency‍

Proactive‍ communication and‌ transparency‍ are essential‌ for managing‍ client expectations during construction delays. This includes:

  • Providing‍ regular‌ updates‌ on‌ the project’s progress‍ and any‍ potential‍ delays.
  • Explaining‌ the‍ causes‌ of‍ the‌ delays‌ in‍ a clear‌ and concise manner.
  • Offering realistic timelines‌ for completion.
  • Being honest‌ and upfront about any‍ challenges‌ or‍ setbacks.

Setting‌ Realistic Timelines‍ and Contingency‍ Plans‍

Setting‌ realistic‌ timelines‍ and‍ developing contingency plans‍ can help manage‍ client‌ expectations‌ and‍ prevent disappointment. This includes:

  • Factoring in potential delays‍ during the‌ planning‌ phase.
  • Developing contingency plans‍ to‍ address unforeseen‍ challenges.
  • Communicating these plans to the‍ client‍ so‍ that they are aware of the potential for‌ delays.

Addressing Client Concerns and Questions‌ Promptly

Addressing‌ client‌ concerns‍ and questions promptly is‍ crucial‍ for building‍ trust‌ and‍ maintaining‌ a‍ positive relationship. This includes:

  • Responding to‌ client inquiries in‌ a‍ timely and professional manner.
  • Providing clear and‌ accurate‍ information.
  • Being empathetic and understanding of their‌ concerns.

By practicing‍ proactive‍ communication, setting‌ realistic‌ timelines, and addressing client concerns promptly, you can‍ manage‍ client expectations‍ effectively and‍ minimize‍ conflicts.

The Role of‍ Technology‌ in Preventing and Mitigating‍ Delays‌

Technology has‍ revolutionized the construction industry, providing‌ new‍ tools and‌ strategies for preventing‍ and‍ mitigating delays. From project management‌ software‍ to‍ drone technology, there are numerous ways‌ to leverage‌ technology‍ to‍ improve project outcomes.

Project Management‌ Software and Collaboration Tools

Project‍ management software‌ and‌ collaboration tools can‌ streamline communication, improve‍ coordination, and facilitate real-time tracking‌ of‌ project progress. These tools can help:

  • Create‌ detailed schedules and track milestones.
  • Assign tasks and responsibilities.
  • Manage communication‍ between stakeholders.
  • Identify‍ potential‍ bottlenecks and delays.

Building Information‌ Modeling‌ (BIM) for‌ Enhanced Design‍ and Planning‍

Building‍ Information‌ Modeling (BIM) is a digital‍ representation of a building that can be used for‌ design, planning, and‍ construction. BIM‍ can help:

  • Identify potential design flaws and conflicts‍ before construction begins.
  • Improve coordination between architects, engineers, and contractors.
  • Reduce‍ rework‌ and‌ errors.
  • Improve project‍ efficiency.

Drone Technology‌ for‌ Site‌ Monitoring‍ and Progress Tracking

Drone technology‍ can be‍ used for site‌ monitoring and progress‌ tracking. Drones‌ can:

  • Capture‌ aerial images and videos‍ of‍ the‍ construction site.
  • Monitor‌ progress and identify‌ potential delays.
  • Inspect hard-to-reach‍ areas.
  • Improve‌ site‌ safety.

By‍ leveraging technology, construction‍ companies‍ can‍ improve‍ project efficiency, reduce delays, and enhance‌ overall project outcomes.

Managing‍ Supply Chain‍ Disruptions to Avoid‍ Material Delays‌

Supply‌ chain‍ disruptions‌ have become increasingly common in recent years, leading‍ to material delays that can‌ significantly‌ impact‍ construction‌ projects. Implementing‍ strategies‍ to‍ manage these‌ disruptions‍ is crucial for‍ ensuring a steady‍ flow of materials and‍ minimizing‌ delays.

Diversifying‍ Suppliers‌ and Exploring Alternative Materials‍

Diversifying‌ suppliers‍ and exploring alternative‍ materials can reduce‍ your‌ reliance on‌ a single source‍ and‌ mitigate the‍ impact‌ of‍ supply‍ chain‌ disruptions. This‌ includes:

  • Identifying‌ multiple‌ suppliers‌ for critical materials.
  • Exploring‍ alternative‍ materials that can‌ be substituted‌ if‌ necessary.
  • Establishing‌ relationships‍ with local‌ suppliers.

Implementing Inventory‌ Management‌ Strategies‌

Implementing‍ inventory management‍ strategies can help‌ ensure‍ that you have‌ an adequate‍ supply of‌ materials on‍ hand‌ to meet your needs. This includes:

  • Forecasting material needs‌ based‌ on‌ the project schedule.
  • Maintaining‍ a‌ buffer‍ stock‍ of critical materials.
  • Using‍ inventory management software to track material levels.

Communicating Regularly with‍ Suppliers and‍ Subcontractors

Communicating regularly‍ with suppliers and‍ subcontractors can‌ help you stay informed‌ about potential supply‍ chain‌ disruptions‌ and take proactive‌ steps to‍ mitigate their impact. This includes:

  • Checking‍ in‌ with‍ suppliers regularly‍ to‌ confirm‌ delivery schedules.
  • Monitoring‌ industry news‍ and trends to‌ identify‌ potential disruptions.
  • Sharing‌ information‍ with‍ subcontractors to ensure that‌ they are aware‌ of any‍ potential material‌ delays.

By‌ managing supply chain disruptions effectively, construction companies can reduce the risk‍ of‍ material‌ delays and ensure smoother project‍ completion.

Here are‌ some‌ frequently asked questions about construction delays:

What are‍ the‌ most common causes‍ of‍ construction delays?
The‍ most‌ common‌ causes include inadequate planning and‌ design, material procurement issues, labor‍ shortages , weather‍ conditions‍ , and‌ regulatory‌ hurdles. Communication breakdowns and‌ coordination challenges‌ among subcontractors can‌ also‌ contribute‌ to delays. Addressing these issues proactively through thorough planning , risk management , and effective communication can‌ help minimize‌ the risk of‌ delays.

How‌ can‌ I minimize‌ the‍ impact of construction delays on‍ my‌ project?
To‍ minimize the‌ impact, start‍ with‌ a detailed‌ project plan‍ and risk‍ assessment. Maintain open communication‍ with all‌ stakeholders, including‍ the contractor, subcontractors, and suppliers. Implement‌ project management software‍ to track‍ progress‌ and‍ identify‍ potential‌ bottlenecks. Negotiate‌ a well-defined‌ contract that‌ addresses‌ potential‌ delays‌ and‍ provides‌ a‍ mechanism for‌ dispute resolution. Having‌ a‍ contingency‌ plan‍ in‍ place can help manage unforeseen challenges effectively.

What should‍ I‍ do if‍ I‍ experience significant construction‍ delays?
If you‍ experience significant‌ delays, document all‌ issues and‌ communications related‌ to the delay. Review‌ your contract to understand‍ your‌ rights and obligations. Communicate‍ with‌ the‌ contractor‍ to‌ address the issues and seek a‍ resolution. Consider‍ seeking‌ legal advice if the delays‍ are causing‌ significant financial harm. Keeping‍ detailed records and‌ maintaining open‍ communication‍ can‍ help protect‌ your interests.

How do‌ material delays‍ affect‍ construction‌ timelines?
Material‌ delays‍ can significantly disrupt construction timelines, especially‍ when critical components‍ are unavailable. These delays can result from‌ supply chain issues, manufacturing slowdowns, or‌ unforeseen demand surges. To mitigate‍ these‍ impacts, ensure‍ proactive‍ communication with‍ suppliers, explore alternative‍ material‌ options, and maintain buffer‌ stock for‍ essential items‌ where possible. Having a‍ flexible schedule and being ready to‍ adapt to material‌ substitutions can‌ also‍ minimize‍ disruptions.

In conclusion , understanding‍ the‍ causes of‌ construction‍ delays is‌ crucial for both‍ homeowners and‌ contractors. By addressing‌ these issues‍ proactively , such as communication‌ breakdowns , material‍ shortages , and‌ unforeseen site‌ conditions , you‍ can‌ mitigate‍ the‍ risk‌ of‍ delays‍ and ensure‍ a‍ smoother construction‍ process. Remember to‍ maintain‍ open communication‍ , conduct‍ thorough planning , and‌ seek‍ expert advice‌ when needed. Taking these‌ steps will‌ help‍ you‍ achieve‍ your construction goals on time‌ and‌ within budget. The‍ next step‌ involves careful project‌ management‍ and‌ perhaps‌ consulting‍ with legal experts to‌ understand‍ your‌ rights‍ and options in case‌ of significant‍ delays.